Datacenter Tour -
Orlando, Florida - USA
Our state of the art datacenters ensure only the best uptime for your mission critical needs!
tmzVPS operates out of the privately owned DimeNOC datacenter in the South East USA region and is code named DC2. It was designed from the ground up based on decades of experience from DimeNOC engineers with stability, reliability and the highest level of uptime standards in mind. Paralleled with diverse path network fiber into the facility and over 4 tier 1 network providers it is no surprise it is consistently ranked one of the premier facilities in the South East USA region to partner with.
The primary objective in designing this facility was to ensure the electrical and mechanical systems were mission critical and equally important, efficiently maintained to support scalability and sustain principal performance. Our data centers include complete redundancy in power, network connectivity, fire suppression, and unparalleled security & safety.
Datacenter
- 20,000 square feet
- Single-story building with concrete masonry perimeter walls
- Category 4 storm resistant
- Client Conference Room
- Client Lounge Area
Facility Security
- On-site personnel 24x7x365
- Electronic access control and physical security
- Interlocking Man-trap entry points with badge-only access and Biometric
- Hand Readers provided by ADT Security
- Over 50 IP Cameras provide Video surveillance throughout the Datacenter
Power Infrastructure
- 1 X 500KW Caterpillar Diesel Generator
- 1 X 1250KW Katolight Diesel Generator
- 1 X 500KVA Powerware 9315 UPS
- 1 X 480KVA Powerware 9390 UPS in a parallel N+1 configuration
- 5 X Battery Strings (providing 15 minutes of runtime at full load)
- 2,700 Gallons of fuel capacity for generators
- Routine systems testing and maintenance
Connectivity and Bandwidth
- 10GE - Level3 Communications
- 10GE - Backhaul to Miami Nap of Americas
- 1GE - Savvis
- 1GE - Global Crossing
- 1GE - Tiscalli
- 1GE - Public Peering (NOTA)
- 10GE - Diverse Dark Fiber to Miami Nap of Americas
Air Conditioning
- Constant 72F/45% humidity precision control
- Separate cooling zones
- 237 Tons of total cooling capacity composed of the following :
-
- 6 X 30 Ton Liebert CRAC units
- 1 X 15 Ton Package Air unit
- 1 X 25 Ton Package Air unit
- 1 X 5 Ton Liebert CRAC unit
- 1 X 12 Ton Package Air unit
Test IPs
Los Angeles, California - USA
Our Los Angeles servers are located in CoreSite's famous One Wilshire data center. CoreSite's One Wilshire data center is part of CoreSite's Los Angeles data center offering that brings together the most developed customer ecosystems on the West Coast, including unmatched connectivity to the Asia Pacific markets. More than 300 domestic and international carriers, media and entertainment firms, cloud computing providers, social networking sites, gaming companies, and enterprise customers interconnect via cross-connects or the Any2 Internet peering exchange, opening the door for customer-tocustomer network and business optimization. Diversely routed high-count dark fiber interconnects One Wilshire to 900 N. Alameda, creating CoreSite's Los Angeles data center campus. With more than 600,000 square feet of on-demand capacity, we provide customers with tremendous capacity to scale their businesses.
Connectivity
- 300+ networks, on-net carriers & ISP's
- CoreSite dark fiber pairs link L.A. data centers
- Any2 California: the second largest Internet peering exchange in the U.S.
- Intercontinental cable landing points
- 40+ AsiaPac carriers and ISP's
Datacenter
- Greater than 99.999% uptime
- Tier III infrastructure
- SSAE 16 Type 2 compliance
- Security: on-site officers, mantraps, biometrics, CCTV, key card controls
- Pre-action fire suppression systems
- 24-hour data center monitoring
- 24-hour Operations Support Center
Test IPs
CustodianDC in Maidstone - UK
The Custodian Datacenter is located in one of the premiere cities in the UK. It provides great connectivity to the rest of the potentially advantageous regions. When established this partnership, we always kept the customer in mind. DimeNOC has invested in a solution that will ensure that all clients have a great experience as well as state of the art technology.
Data Center
- 150,000 sq ft total size
- 430mm raised heavy duty flooring
- Engineer build rooms
- Restrooms and kitchen facilities available
- Secure cages from 350 sq ft available with or without racks
Facility Security
- 24x7 secure entry via swipe card system, with 6-layer entry
- Datacentre located inside its own secure compound
- 3-metre fencing and electric entry
- Anti-tailgate systems
- NOC engineers available 24x7 for remote hands service
Power Infrastructure
- 2 megawatt on-site substation
- Diverse power feeds to substation
- Dual AKSA 1.6 megawatt generator connected via C&N ATS systems
- Two main fibre duct points into building and ducts to BlueSquare 1
- N+1 PowerWave UPS system
- N+1 Airedale Air Handling system
- 22°C +/- 2°C data floor temperature
- Dual 16 Amp feed per equipment rack available
Connectivity and Bandwidth
- 20GBit resilient Ethernet ring available to all customers
- 50ms self-healing capacity
Test IPs